PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing rebar at the slab on grade for the Boiler-Electrical Room Facing West.jpg Waterproofing Stair -2-Elev. 4 shear wall at the South Elevation.jpg Continued installing the elevator guide rails at Elev. 1,2,3 Facing North.jpg Started pressure testing the 1st floor gas piping.jpg Started pressure testing the copper piping at the 2nd floor Facing East.jpg Stated welding metal angles around the Monumetnal Stairs Facing East 1.jpg Installed insulation around the Lower Roof walls Facing West.jpg Installed motorized dampers at the 4th floor Facing North.jpg
Previous pageNext page Started pressure testing the 1st floor gas piping
Started pressure testing the 1st floor gas piping